1
Weeks Installation Time
10,837
kg Of Carbon Saved Annually
46,118
kWh Annual Energy Generation
52.48
kWp Size Of Project
Project Details
Crown Plaza Hotel
In partnership with their energy consultant Green Shield Group, we identified their needs from both sustainability and financial standpoints, while ensuring minimal disruption to guest experiences.
Installed 52kWP system at the Crown Plaza Hotel in Ealing London
Planned for minimal disruption to guest occupants
Payback period is expected to be under 3 years
The Process
01 Hotel Energy Goals
After evaluating their energy demand, we realized a full roof space was unnecessary, and instead designed a system tailored to their smaller demand profile. With rising energy prices and a Group-wide initiative to cut energy usage, the hotel was eager to undertake a renewable project to lower their carbon footprint and secure future energy savings.
02 Unintrusive Installation Plan
We planned the installation during periods of low guest occupancy to minimise disruption. Collaborating with the operations team, we ensured all roofs were solid and suitable for the project.
Call to action card to tempt user