Case study

Retail Site Maidstone

Building on successful rooftop solar installations delivered in Leicester and Newcastle, Shawton Energy has completed another commercial solar project at a major retail site in Maidstone.

3

Week Installation Time

42

Tonnes Of Carbon Saved Annually

196,875

kWh Annual Electricity Generation

189.23

kWp Array Output

Solar Panels for retail site rooftop in Maidstone

Project Details

Retail Site Maidstone

Completed in just three weeks, the installation was designed to maximise available roof space and generate clean, renewable electricity to support the site’s day-to-day operations while reducing energy costs.

Delivering long-term energy performance

Improved energy resilience

Minimal disruption during installation

The Process

A smarter way to power retail

The new solar array produces approximately 196,875 kWh of clean electricity each year, reducing reliance on grid power and improving energy resilience. The system is expected to save around 42 tonnes of CO₂ annually, supporting wider sustainability commitments. Installed as a 189.23 kWp rooftop solar system, the solution delivers long-term energy performance while helping mitigate the impact of rising energy costs.

Built for performance and minimal disruption

Installation was carefully scheduled around trading hours to ensure safe access and a seamless integration with the store’s existing electrical systems, keeping disruption to staff and customers to an absolute minimum.

Could your business benefit from solar energy?

The Result

  • Installed in 3 weeks
  • Generates 196,875 kWh of clean energy per year
  • Saves 42 tonnes of CO₂ annually
  • 189.23 kWp rooftop solar system

This installation represents another step in their commitment to improving efficiency, reducing carbon emissions, and creating a more resilient retail estate.

Maidstone retail site rooftop solar panels

Trusted by leading brands: