Case study

BMW Sandal Wakefield

After a successful installation at BMW Soper of Lincoln, BMW were keen to continue their Solar PV journey with Shawton Energy by installing a new system at their location is Sandal, Wakefield.

8

Weeks Installation Time

68,493

kg Of Carbon Saved Annually

228,465

kW Annual Electricity Generation

236.57

kWp Array Output

BMW Sandal Wakefield Logo

Project Details

BMW Sandal Wakefield

Shawton Energy installed a 236.57 kWp system using 577 x Trina Solar TSM-410-DE09.08 PV Modules, 5 x Solar Edge Inverters and 577 x SolarEdge Power Optimisers, at the business in Wakefield.

Substantial energy generation annually

Reduced electricity bills

Lower carbon emissions

The Process

Shawton Energy worked throughout an eight-week installation process at the site to improve sustainability. As this was a large project, we planned ahead to ensure there was no disruption to BMW Sandal’s working hours.

Could your business benefit from solar energy?

The Result

The system will generate 228,465kW of clean green energy every year, saving BMW thousands of pounds on their electricity bills from the first year.

They are also saving over 68 tonnes of carbon emissions annually.